Remodel? Yes... The Drake Public Library In Centerville Iowa was remodeled in 2008 costing $259,000
The McCreery Cancer Center was constructed in 2004.
The Ottumwa Progress, Inc. Building was constructed in 1999 at $1.3 million. Principal Life Insurance took posession of the second floor and interior finishes were completed in 2001.
The CMU, insulation and brick was replaced on the tower pictured here in 2001 at $850,000. A sludge process facility, pump bypass station, and alternate water pumping station were constructed in 2007 at $4.6 million.
The Bridgeview Center was constructed in 2006. The auditorium is pictured here. Grooms & Company's part in this project cost $5.5 million
This church addition was built in 2004. Cost $225,000.
The Ottumwa High auditorium was remodeled in 2002. Cost $1.2 million.
|
|
|